TRANSPARENT PRICING · COST + 5% · NEVER MORE

Maximum Value for the American Taxpayer

Aedes is a coordination layer, not a defense prime. We do not mark up hardware 10x. We do not bill $400 for a bolt. Our pricing formula is public, our margin is capped at 5%, and every dollar above that goes back to the builders who earned it.

Aedes never takes more than 5% of any transaction. This is a binding operational commitment.

The Pricing Formula

One formula. Published. Auditable. No exceptions.

Unit Price = Materials + Builder Labor + QA + 5% Platform Fee
1

Materials

BOM + 10% logistics

Every physical component — frame, motors, electronics, props, fasteners. Plus a 10% buffer for domestic procurement and shipping.

Paid to: U.S. component suppliers
2

Builder Labor

$126.44/hr floor rate

Certified builder time at a minimum floor of $126.44/hr. Specialization and performance command above-floor rates. Builders are paid for verified, QA-accepted output only.

Paid to: Certified network builders
3

QA Fee

Fixed per unit type

Regional QA hub inspection, flight testing, certification, and documentation. Every unit that ships has a traceable quality record.

Paid to: QA hub operators (network members)
4

Aedes Platform Fee

5% of above — hard cap

Platform operations, design package maintenance, compliance program, insurance, and R&D. Capped at 5%. Never more. Any surplus above documented operating costs goes back to the network.

Paid to: Aedes operations

Unit Economics — Reference Systems

Actual cost breakdowns for the Aedes MD and HX-1 at standard production volume.

Aedes MD

Mosquito Drone · 250mm Quad

~$1,456
per unit
Bill of Materials$320
Procurement buffer (10%)$32
Builder labor (7 hrs × $126.44)$885
QA fee$150
Cost of Production$1,387
Aedes Platform Fee (5%)$69
Unit Price to Government~$1,456

vs. DoD Prime equivalent: $5,000–$25,000+  ·  Savings: 70–94%

HX-1 Heavy Hex

Heavy-Lift ISR · 900mm Hex

~$4,293
per unit
Bill of Materials$1,100
Procurement buffer (10%)$110
Builder labor (20 hrs × $126.44)$2,529
QA fee$350
Cost of Production$4,089
Aedes Platform Fee (5%)$204
Unit Price to Government~$4,293

vs. DoD Prime equivalent: $25,000–$150,000+  ·  Savings: 83–97%

Volume Pricing

Fixed costs amortize across volume. Larger orders mean lower per-unit prices — and 100% of the discount passes through to the government. Aedes's 5% cap is maintained at every volume tier.

Order VolumeAedes MDHX-1Discount
1 – 999$1,456$4,293Standard
1,000 – 9,999$1,339$3,907~8%
10,000 – 99,999$1,194$3,520~18%
100,000+$1,066$3,150~27%
200,000 (Proposal B)$1,022$2,958~30%

Prices are reference estimates based on current BOM costs and builder rates. Final pricing confirmed at contract execution.

How Builders Get Paid

Pay is tied to verified output. No hourly clock. No retainer. You get paid for drones that pass QA — nothing else.

$126.44/hr
Floor Rate

Minimum guaranteed labor rate, calculated against standard build hours per system. Actual earnings scale with output.

QA-Gated
Pay on Acceptance

Payment triggered only on QA Hub acceptance. Failed units are not compensated. Quality is the only metric that matters.

Merit
High Performers Earn More

Top-tier builders receive above-floor rates, priority job allocation, and access to higher-value production runs.

Builder floor rate: $126.44/hr. BOM and QA costs updated April 2026.

Transparency Commitments

We publish what matters. These are not aspirational — they are operational commitments.

📐

The Pricing Formula

Always published here. Always the same formula. No exceptions, no overrides.

🧾

Current BOM Costs

Component costs updated quarterly as market prices change. You always know what things actually cost.

💰

Builder Floor Rate

Minimum $30/hr, published. Builders are never underpaid to make our margins look better.

QA Fee Schedule

Fixed rates by system type, published. No variable fees, no hidden charges.

📊

Aedes Operating Expenses

Annual report with line-item summary. See exactly what the 5% covers.

🔗

Taxpayer Savings Methodology

Published comparison methodology vs. prime contractor pricing. Every number is verifiable.

🇺🇸

Taxpayer Savings Counter

Running total of cumulative savings vs. prime contractor comparable pricing.

🇺🇸

The Taxpayer Promise

When the federal government buys through Aedes, they are buying at cost-plus-5%. Not cost-plus-300%. Not cost-plus-1,000%.

For every $1B spent on Aedes production, the taxpayer receives what would cost $10B–$100B from a traditional defense prime — and the money goes to American workers in every state, not to a handful of shareholders on the Fortune 500.

This is not an aspiration. It is a structural feature of how Aedes is built.

View Federal Proposals →Our Compliance Program →